7th Engineering  Operations Facility

The 7th Engineering Battalion Operations project includes construction of 4 new buildings totaling 137,342 square feet on a 20 acre site at Fort Drum, NY.

The new buildings include a 15,011 sf Battalion Headquarters (BnHQ), a 66,725 sf Company Operations Facility (COF), a 31,107 sf Tactical Equipment Maintenance Facility (TEMF) and a 17,549 sf Dining Facility (DF). The Battalion Headquarters building includes administrative offices and classrooms.

The buildings are designed and constructed utilizing structural steel, steel joists, and light gauge metal truss framing. The exterior consists of masonry with insulated metal wall panels, standing seam metal roofing system and heavy duty commercial grade windows and doors. A new 325-space asphalt parking lot for POV’s is provided between as well as 32,033 sy of concrete hardstand is provided surrounding the TEMF to accommodate parking of tactical vehicles. At the COF, a 13,659 sf exterior covered hardstand area is provided. Supplementing the TEMF building include a 5,600 sf organizational storage building, a 675 sf hazmat storage building, a 675 sf oil storage building and two 500-gallon above ground exterior storage oil/antifreeze storage tanks are provided outside and adjacent to the TEMF.

Category: Industrial
Location: Fort Drum, NY
Architect: Beardsley Design Associates
Contract Value: 34,797,857
LEED: silver

Related Projects

Maneuver Area Training Equipment Site (NY)

Maneuver Area Training Equipment Site (NY)

This project consisted of the construction of a new 193,000 sq. ft. maintenance and support facility for the New York Army National Guard’s…
Maneuver Area Training Equipment Site (NY)
North Range Complex

North Range Complex

The North Range Complex consists of 71,000 square feet of new construction of new administrative and support facilities for track vehicle…
North Range Complex
Fire and Emergency Services - Phase III

Fire and Emergency Services - Phase III

This Design/Build project consists of the design and construction of the third phase of the Fire and Emergency Services Center Facility at…
Fire and Emergency Services - Phase III